I'm pretty handy... Recently renovated a studio apartment, took everything off, including tiles all carpets, kitchen, toilet... the place was bare afterwards. Then I've tiled the bathroom and kitchen, put in a plaster wall, built in wardrobe, new kitchen... had electrician replace the fuse box and move a bit of cabling, plumber came to re-install the water heater and put the toilet on and floating floors were installed by some guys because i didn't want to buy power tools I'd only use once. the rest was done by me <img src="/ubbthreads/images/graemlins/cool.gif" alt="" />


JYD #154